US Wind Farm Being Paid NOT to Produce Power

  •   The Alex Jones Channel Alex Jones Show podcast Prison Planet TV Infowars.com Twitter Alex Jones' Facebook Infowars store

Pacific Northwest green power project another in a long list of state-subsidized failures in the new carbon economy

Dan Springer
FOX News
March 9, 2012

Wind farms in the Pacific Northwest — built with government subsidies and maintained with tax credits for every megawatt produced — are now getting paid to shut down as the federal agency charged with managing the region’s electricity grid says there’s an oversupply of renewable power at certain times of the year.

The problem arose during the late spring and early summer last year. Rapid snow melt filled the Columbia River Basin. The water rushed through the 31 dams run by the Bonneville Power Administration, a federal agency based in Portland, Ore., allowing for peak hydropower generation. At the very same time, the wind howled, leading to maximum wind power production.

Demand could not keep up with supply, so BPA shut down the wind farms for nearly 200 hours over 38 days. 

“It’s the one system in the world where in real time, moment to moment, you have to produce as much energy as is being consumed,” BPA spokesman Doug Johnson said of the renewable energy.

Read more

This article was posted: Friday, March 9, 2012 at 9:44 pm







Infowars.com Videos:

Comment on this article

Comments are closed.


Watch the News

FEATURED VIDEOS
Harry Reid Blatantly Lies To America See the rest on the Alex Jones YouTube channel.

Smart Guns Endanger Children See the rest on the Alex Jones YouTube channel.

© 2013 Infowars.com is a Free Speech Systems, LLC company. All rights reserved. Digital Millennium Copyright Act Notice.