Malcolm Moore
The Telegraph
April 17, 2011

It was the first time that Tokyo Electric Power company (Tepco) has given a clear timeline for repairing the damage at the plant, and came after repeated complaints at the lack of clear information about the situation.

A phased plan will first target a “cold shutdown” of the plant’s reactor cores, when temperatures are brought down under 100 degrees C.

Fresh food that lasts from eFoods Direct (Ad)

In the second step, 60,000 tons of radioactive water that currently flood the plant will be “decreased” and decontaminated. Meanwhile the entire building will be covered with a special structure to stop radioactive material escaping.

Read entire article

Pick up the next evolution of activated nascent iodine today with Survival Shield X-3 now at 60% off!


Related Articles


Comments